 |
Introduction |
1 |
 |
Terminology
|
3
|
 |
Construction
Delivery Methods |
14 |
Design, Bid, Build |
14 |
| Time |
14 |
| Control During Design |
15 |
| Control During Construction |
15 |
| Price for Construction |
16 |
| Extra Costs |
16 |
| Reasons for Changes |
17 |
| Time for Completion |
17 |
| What Can Happen |
17 |
| Construction Management |
19 |
| Time |
20 |
| Control During Design |
20 |
| Control During Construction |
20 |
| Price for Construction |
21 |
| Extra Costs |
21 |
| Time for Completion |
21 |
| What Can Happen |
21 |
| Design-Build |
22 |
| Time |
22 |
| Control During Design |
24 |
| Control During Construction |
26 |
| Price for Construction |
28 |
| Extra Costs |
29 |
| Reasons for Changes |
29 |
| Time for Completion |
30 |
| What Can Happen |
30 |
| Project Management |
31 |
| Cost Plus Contract |
31 |
| Negotiated Contracts |
32 |
 |
Building
Components,
Services and Systems |
33 |
| Codes and Standards |
33 |
| Other Issues of Codes and Standards |
36 |
| Building Components |
36 |
| Architectural Systems |
37 |
| Combustible Construction |
37 |
| Non-Combustible Construction |
38 |
| Roofing |
38 |
| Ceilings |
39 |
| Exterior Wall Systems |
41 |
| Interior Wall Systems |
42 |
| Flooring Systems |
43 |
Millwork Systems |
44 |
Hardware |
44 |
Elevators, Escalators and Stairs |
45 |
Structural Systems |
45 |
Wood/Steel Elements |
46 |
Concrete |
46 |
Design |
49 |
Seismic Design |
49 |
Mechanical Systems - Hvac |
50 |
Ventilation |
50 |
Indoor Air Quality |
51 |
Air Handling Systems |
51 |
Air Ducts |
51 |
Duct Insulation |
52 |
Fire Dampers |
53 |
Supply Air Diffusers |
53 |
Air Recirculation |
53 |
Return Air |
53 |
Exhaust Air |
54 |
Vibration Isolation |
55 |
Heating Systems |
55 |
Electric Heat |
55 |
Heating Systems Other Than Electric |
56 |
Forced Air Heating |
56 |
Hot Water Heating |
57 |
Heat Pumps |
57 |
Air Conditioning |
57 |
Building Comfort Zones |
60 |
Mechanical System Controls |
61 |
Mechanical Systems Balancing and
Commissioning |
62 |
Balancing |
62 |
Commissioning |
62 |
Site Drainage |
63 |
Foundation or Footing Drains |
64 |
Mechanical Systems - Plumbing |
64 |
Rainwater Drain Piping |
64 |
Sewage Piping, Sanitary Piping |
65 |
Drain Piping General |
65 |
Pumping |
66 |
Disposal |
66 |
Clean-outs |
66 |
Pressure Piping Systems |
67 |
Water Hammer |
67 |
Insulation |
67 |
Hot Water |
68 |
Gas Piping |
69 |
Plumbing System Considerations |
69 |
Mechanical Systems - Fire Suppression
Systems or Fire Protection Systems |
70 |
Sprinkler Systems |
70 |
Wet Sprinkler System |
70 |
Dry Sprinkler System |
71 |
Preaction Sprinkler System |
71 |
Deluge Sprinkler System |
71 |
Sprinkler Systems General |
72 |
Fire Pump |
72 |
Total Flooding Fire Suppression Systems |
73 |
Electrical Systems |
74 |
Electrical Terminology |
74 |
Utility Services |
75 |
Power Service |
76 |
Codes and Standards |
76 |
Efficiency of Light Sources |
77 |
Fluorescent Ballasts |
77 |
HID Light Sources |
78 |
Fluorescent Lighting |
78 |
Pot-Lights |
78 |
Color Rendering Ability |
79 |
Lighting of Spaces Where Computers are Used |
80 |
Cost of Owning a Lighting System |
81 |
Interior Lighting Control |
81 |
Considerations Regarding Exterior
Lighting |
83 |
Exterior Lighting Control |
85 |
Emergency Lighting |
85 |
Standby or Emergency Generator |
86 |
Exit Signs |
87 |
Fire Alarm System |
87 |
Fire Alarm System Components |
89 |
Costs of Ownership of a Fire Alarm
System |
89 |
Smoke Alarms |
90 |
Telephone Service |
91 |
Telephone and Data Wiring |
92 |
Cables for Telephone and Data
Communications |
92 |
PCBs |
93 |
Other Discussion Topics |
93 |

|
Issues
in Common For All Construction
Delivery Methods |
94 |
Issues Related to the Site |
94 |
Sloping Site |
94 |
Soil Conditions on the Site |
94 |
Geotechnical Testing or Soils Testing |
94 |
Sub-Surface Conditions |
95 |
Contamination |
95 |
A Change in Soil Conditions |
96 |
Rock |
97 |
Groundwater |
97 |
Environmental Sensitivity |
98 |
Heritage |
98 |
Servicing of Sites |
98 |
Construction Types |
99 |
Costs and Related Issues |
100 |
Operation and Maintenance Costs |
100 |
Value Analysis |
102 |
Initial Considerations of Operation and
Maintenance Costs |
103 |
Budget Considerations Regarding Operation and
Maintenance Costs |
105 |
Why Operation and Maintenance Costs Will
Often Be Ignored |
107 |
Costs Associated with Building Design |
108 |
Construction Budget |
109 |
Incremental Cost Considerations |
112 |
Maintenance Considerations |
112 |
Access for Maintenance of Building
Services |
112 |
Maintenance of Building Finishes |
117 |
Other Initial Decisions That Can Become
Maintenance Liabilities |
118 |
Cracking of Concrete Floor Slabs in
Wood-Frame Construction |
119 |
Deterioration of Structural Elements in
Concrete Slabs |
120 |
Buildings and Water |
121 |
Slabs On Grade |
121 |
Foundation Walls |
122 |
Exterior Walls |
123 |
Water Entry Prevention |
125 |
Staining |
126 |
Building Systems Consolidation |
126 |
Single Source Supply |
127 |
Captive Owner |
127 |
Owner Instruction |
129 |
Owner Beware |
129 |
Avoidance of Single Source Supply |
131 |
The Rewards of Single Source Supply |
131 |
Single Tender or Proposal |
132 |
Single Sub-Contractor |
132 |
Unique Products |
132 |
Expensive and Custom-Made Products
|
133 |
Standard Building Components |
134 |
Owners at a Disadvantage |
134 |
Management Companies |
135 |
Warranty |
135 |
Questionable Practices |
139 |
Residential Selling |
140 |
Liabilities Created |
140 |
Changes |
140 |
Change Documentation |
143 |
Change Pricing |
144 |
Disputes Related To Changes |
145 |
As-Built Drawings as a Source of
Changes |
147 |
Re-stocking Charge |
147 |
Labor Costs |
147 |
Savings |
148 |
Reasons Why Savings Can Be Made |
150 |
Common Suggestions for Savings |
152 |
Providing Definition To a Scope of Work
|
158 |
Design, Bid, Build/Design-Build Project
Definition |
161 |
Exclusions in Design-Build |
161 |
Design and its Manifestations |
162 |
Interpretation of Specifications |
162 |
Relationships and Involvements with the
General Contractor |
163 |
General Contractor |
164 |
General Contractors On Site
Representative |
164 |
General Contractors Abilities |
165 |
Contractor/Sub-Contractor Relationship |
166 |
New Products, New Technology and
Innovation |
166 |
New Products |
166 |
New Technology |
168 |
Innovation |
169 |
Overview |
170 |
Late Completion |
170 |
Addenda |
171 |
Work Performed in Existing Buildings
|
171 |
Problems in Existing Buildings |
174 |
Materials Containing Asbestos |
175 |
As-Built Drawings or Record Drawings
|
176 |
Critical Path |
178 |
Construction Climate |
179 |
Workings of the Industry |
179 |
Games People Play |
181 |

|
Design,
Bid, Build |
182 |
Building Consultants |
182 |
Architectural Consultant |
183 |
Geotechnical Consultant |
186 |
Structural Consultant |
186 |
Mechanical Consultant |
187 |
Electrical Consultant |
187 |
Cost Consultant |
187 |
Acoustic Consultant |
189 |
Building Code Consultant, Fire Protection
Consultant |
189 |
Fire Protection Consultant |
189 |
Building Envelope Consultant |
189 |
Certified Professional |
190 |
Civil Engineering Consultant |
190 |
Communications Consultant |
190 |
Energy Consultant |
191 |
Environmental Consultant |
191 |
Food Services Consultant (often called a
Kitchen Consultant) |
191 |
Hardware Consultant |
191 |
Interior Design Consultant |
191 |
Landscape Consultant |
192 |
Lighting Design Consultant |
192 |
Programming Consultant |
192 |
Roofing Consultant |
192 |
Scheduling Consultant |
192 |
Security Systems Consultant |
193 |
Seismic Anchoring Design Consultant |
193 |
Specifications Consultant |
193 |
Theatre Consultant |
193 |
Traffic Consultant |
193 |
Consulting Office |
193 |
What Is Important For Design? |
195 |
Consultants Experience |
197 |
Extra Costs |
199 |
Hiring Consultants |
203 |
Consultant and Contractor Interaction |
203 |
Consultant and Owner Interaction |
204 |
Coordination |
205 |
Design Coordination |
205 |
Question of Inclusion |
211 |
On-Site Coordination |
212 |
Fees |
213 |
Percentage |
214 |
Time |
216 |
Cost Plus |
217 |
Fixed Fee |
217 |
Consulting Fee Components |
218 |
Defining a Scope of Work For Consultants
|
218 |
Undefined Scope of Consulting Service |
219 |
Misunderstandings Regarding Fees |
220 |
Periodic Site Visits |
221 |
Owners Continuous Presence on Site |
222 |
As-Built Drawings |
223 |
Reduced Design |
223 |
Renovation Projects |
224 |
Economy of Scale with Regard to Fees |
224 |
Tendering or Bid Phase of Construction
|
225 |
Bid Bond |
228 |
Instructions to Bidders |
231 |
Bid Depository |
232 |
Tender Preparation Costs |
232 |
Check Prices |
232 |
Alternative and Separate Prices |
233 |
Unique and Single Source Supply |
234 |
Tendering Period |
235 |
Unit Prices |
236 |
Schedule for Completion |
237 |
Low Tenderer |
238 |
Acceptance of Tenders |
239 |
Late Tenders |
239 |
Single Tender |
239 |
Pricing of Changes |
239 |
Onerous Contractual Clauses |
239 |
Tender Price Changes by Fax |
241 |
Naming of Sub-trades and Suppliers |
242 |
Savings |
244 |
Addenda |
244 |
Post-Tender Addendum |
245 |
Addenda and Coordination |
245 |
Design and Its Manifestations |
246 |
No Consultant |
246 |
Minimal Design |
247 |
Employee Involvement in Design |
249 |
Owners Resources |
249 |
Service Room Locations |
249 |
Design Process |
250 |
Schematic Design |
250 |
Energy Modeling |
251 |
Alternative Designs |
251 |
Design Development |
251 |
Construction Documents Stage of Design |
252 |
Design Manuals |
252 |
Construction Documentation |
252 |
Drawings |
252 |
Specifications |
252 |
Monetary Allowance |
254 |
Shop Drawings |
254 |
Long Delivery Items |
257 |
Dealing with Long Delivery Items |
258 |
Tenant Improvements |
258 |
Manual Keying |
258 |
One Possible Design, Bid, Build Project |
259 |
|
Design-Build
|
260 |
Design-Build Entities |
261 |
Project Definition Documents |
262 |
Cost of Responding |
264 |
Request for Proposal Process |
264 |
Owner Involvement |
265 |
Building Consultants and Design |
267 |
Similar Designers |
268 |
Fees |
268 |
As-Built Drawings |
269 |
Separate and Alternative Prices |
270 |
Unit Prices |
270 |
Unique and Single Source Supply |
270 |
Proposal Submission Process |
270 |
Schedule for Completion |
271 |
Proposal with Lowest Price |
271 |
Late Submissions |
271 |
Single Proposal |
271 |
Pricing of Changes |
272 |
Onerous Contractual Clauses |
272 |
Proposal Price Changes |
272 |
Naming of Sub-Trades and Suppliers |
272 |
Project Award |
273 |
Design |
274 |
Construction Documentation |
274 |
Shop Drawings |
275 |
Long Delivery Items |
275 |
Coordination |
275 |
Substantial Performance |
275 |

|
Disputes
and Dispute Resolution |
276 |
Avoidance of Disputes |
278 |
Lack of Due Diligence |
|